    Planning fallacy

    What it is

    The planning fallacy is the tendency to expect that your own task will go to plan, and so to underestimate how long it will take, even when you know that similar tasks in the past ran late.¹

    The psychologists Buehler, Griffin and Ross described it as "the tendency to hold a confident belief that one's own project will proceed as planned, even while knowing that the vast majority of similar projects have run late." They attribute the name to the psychologists Daniel Kahneman and Amos Tversky, who used it in 1979.¹

    The intriguing part is holding two beliefs at once. People know that most of their past predictions were overly optimistic, yet they still believe that this time their forecast is realistic.¹

    Why it matters

    If you always plan as if this task will go smoothly, you will keep running late. That can throw off a work week, a household job, or a study deadline.

    The bias is about how we forecast our own tasks, not about being lazy. In the same research, people who predicted someone else's task were not optimistic: they overestimated how long it would take, and they made more use of relevant past experience.¹

    Optimistic predictions are not useless. In one study they still ranked people correctly: those who predicted a longer wait did tend to take longer (a correlation of r = .77).¹ A correlation is a number that describes how strongly two things move together. But the typical forecast was still too early.

    The thesis study

    Buehler and colleagues asked 37 honours-psychology students at Waterloo when they expected to finish their thesis. On average, their best guesses were 33.9 days. They actually took 55.5 days. Fewer than a third (29.7%) finished by their own most accurate prediction.¹ Four students had not finished when the records stopped, so the comparison uses the rest. That omission would, if anything, make the bias look smaller.¹

    The students also gave a worst-case guess: "if everything went as poorly as it possibly could." Even those pessimistic dates averaged 48.6 days, still a little earlier than the 55.5 days they actually took. The difference was not statistically significant, and fewer than half (48.7%) finished by that pessimistic date.¹ "Just think of the worst case" reduced the average optimism but did not make the forecasts more accurate.¹

    This was one university, one kind of task, and a modest sample. Treat it as a clear demonstration, not a universal number.

    Why plans feel reliable, and the outside-view fix

    When people predict their own finish times, they tend to focus on future plans and scenarios rather than on past experience.¹ Kahneman and the economist Lovallo called this the inside view: you forecast by working through this task's own plan and steps. Overly optimistic forecasts, they argue, come from that inside view, which "anchors predictions on plans and scenarios." Decision makers "neglect the statistics of the past in evaluating current plans."²

    The outside view does the opposite. It bases the forecast on how comparable past tasks actually turned out.³ A reference class is the group of similar past tasks you use for that comparison.³ One method, called reference class forecasting, has three steps: identify a relevant class of past, similar projects; establish how those projects actually turned out; and compare your project with that pattern.³ This method is described for large public projects. The same idea can be used on personal tasks, but the evidence for those steps comes from that larger setting.

    One more caveat for big public projects: delays and overruns can also come from deliberate over-optimism, not only from self-deception.³˒¹ For everyday personal tasks, the planning fallacy is the main idea here.

    Merely recalling the past is not enough. In a later study, the bias eased only when people both considered their past experiences and linked them to the task at hand. In that "recall-relevant" condition, 60.0% finished within the predicted time, compared with 38.1% who only recalled the past and 29.3% in a control group. The average optimism disappeared. But the predictions were no more accurate: the size of the individual errors did not shrink.¹ That study used a short computer assignment of about an hour, with deadlines of one or two weeks.

    In everyday life

    • Imagine you estimate that painting the hallway will take one Saturday afternoon. Your last three DIY jobs each took about twice your estimate. The outside view says: plan for a whole weekend.
    • Suppose a student plans to write an essay "Thursday night." Before deciding, they list how long their last three essays really took, and they ask how this one is like those.
    • A work project "should be done by Friday" because the plan has no snags. Ask: when did the last three similar projects actually finish?

    The common trap

    The first trap is treating late finishes as laziness or bad character. The research points to a cognitive pattern: focusing on the plan and neglecting the past.¹

    The second trap is thinking that a worst-case guess will fix it. In the thesis study it did not make forecasts more accurate.¹

    The third trap is thinking that remembering past delays is enough. Recall alone did not reduce the bias; linking the past to the current task did.¹

    Some ways out:

    • Write down how long similar tasks really took, then use that record for this one.
    • Predict someone else's timeline, or ask someone else to predict yours. Observers were not optimistic.¹
    • Treat your best-guess date as a hopeful plan, and give yourself a later fallback based on the outside view.

    Try it

    For the next five household or study tasks, write a best-guess finish time before you start, and the real finish time after. Then, for the next five, first look at your record, note how those tasks resembled this one, and adjust. Compare the two sets. You don't need a statistical test. Just look at the gaps.

    Related concepts

    Cognitive shortcuts · Probabilistic reasoning · Scenario planning · Sunk cost fallacy · Hindsight bias · Conjunction fallacy · Baseline · Pre-registration

    Sources

    1. Buehler, R., Griffin, D., & Ross, M. (1994). Exploring the "planning fallacy": Why people underestimate their task completion times. Journal of Personality and Social Psychology, 67(3), 366–381. doi:10.1037/0022-3514.67.3.366. Full text: MIT-hosted PDF of Buehler et al. 1994

    2. Kahneman, D., & Lovallo, D. (1993). Timid choices and bold forecasts: A cognitive perspective on risk taking. Management Science, 39(1), 17–31. doi:10.1287/mnsc.39.1.17

    3. Flyvbjerg, B. (2006). From Nobel Prize to project management: Getting risks right. Project Management Journal, 37(3), 5–15. doi:10.1177/875697280603700302. Full text: arXiv:1302.3642 version of Flyvbjerg 2006